What if UE receives Dynamic scheduling middle of SPS?

0 votes
50 views

In the above condition UE should follow the dynamic scheduling, but after this occasion will the UE continue SPS scheduling in next occasion or discontinue the SPS scheduling.

posted Jan 3 by Jaganathan

Share this question
Facebook Share Button Twitter Share Button LinkedIn Share Button

1 Answer

0 votes

Hi Jagnathan,

It UE receives an dynamic grant during SPS Sub frame then UE has to use dynamic grant only, Dynamic grant overrides SPS grant at any point of time.

answer Jan 6 by Himani
Similar Questions
+2 votes

if cross carrier scheduling is enabled then primary cell can schedule the secondary ENB, then will UE monitor the PDCCH of secondary cell? if yes Why it is required?

0 votes

However we have CSI in LTE ,we could have used same for SPS scheduling but why do we need different CSI report for SPS?