Can a eNB belongs to multiple tracking area if the eNB is shared between two operator under e-UTRAN sharing model ?

+3 votes
1,570 views

Suppose a eNB is shared between two operators so can he have multiple tracking area code ?

posted May 21, 2015 by Sachidananda Sahu

Share this question
Facebook Share Button Twitter Share Button LinkedIn Share Button

1 Answer

+2 votes

System Information Block-1 (SIB1) broadcasts only one tracking area code in cell. It means one cell can't be part of two different tracking area. SIB1 can also carry max to 6 PLMNs. All these PLMNs can belong to same MME or different MMEs in case of network sharing.

As per my understanding of cell level and SIB1 details, if a cell is being shared between multiple operator then both the network will have to consider tracking area a common tracking area. A single cell can't belong to different different operator's tracking area.

I may not be correct, lets others to respond.

answer May 21, 2015 by Harshita
Thanks, just to add point Tracking area is at eNB level, it means tracking area is assigned to an eNB so all the cells belongs to same tracking area.
@sachidananda,    cells in a eNodeB can have different TA.    i.e TA can be at cell level also in an eNodeB.
Okay Thanks for the information.
Similar Questions
+5 votes

Uplink NAS transport message is used between eNodeB and MME to pass NAS messages between UE and MME transparently.
Since eNodeB has already communicated TAI and E-CGI as part of "Initial UE message" and MME knows current serving (cell and tai ) of UE then why both IEs are mandatory in Uplink NAS transport. I think it should be optional and it should be included in the message when there is a change in serving (cell or tai or both).

+5 votes

Who does radio bearer mapping during UTRAN to E-UTRAN handover where source RNC is pre-release 8 ? From the spec what I can see is if the source RNC is pre release 8, then it sends Source RNC to Target RNC transperant container (which I believe carries all the radio bearer related information). The EPC will transperantly forward it to the Target enodeB. Does the target EnodeB do the mapping from RNC container for the radio bearer in the new RAT ?

+1 vote

After UE handover to target ENB it sent RRC Connection Reconfiguration complete.why UE doing suddenly Tracking Area Update request? Even it is in RRC-Connected State.

+3 votes

Can I change tracking are code on the fly for a cell/eNodeB ? If yes then what will happen with the connected/idle UEs ?

...